This site will look much better in a browser that supports
web standards
. It should however still be fully accessible
Your browser does not support script
Library
Search
My List
Help
Library Home
Item Detail
On this page click on any highlighted field to search for additional items related to that field. For example, click on the name of the author to view other articles by the same author. Simply use the "back" browser button to return to this page.
Title:
Guidelines for Verifying Existing Building Commissioning Project Savings - Using Interval Data Energy Models: IPMVP Options B and C
Author(s):
Last Name
First Name
Affiliation
Primary
Jump
David
Quantum Consulting, Inc.
Yes
(click on Author's Last Name or Affiliation to perform a search)
Source of Publication:
California Commissioning Collaborative
Publication Date:
11/2008
Publication Notes:
N/A
Type:
Guideline
Format:
PDF
Add item to My List
Document Size:
1730 Kb
Number of Pages:
125
Abstract:
This guideline documents measurement and verification (M&V) procedures based on short time interval energy data collected from existing buildings and their systems that are undergoing a commissioning process. It describes procedures with which commissioning providers may demonstrate realized savings to building owners, program managers, and program evaluators. It shows how integrating these data-driven M&V methodologies into commissioning processes not only supports completion of more robust commissioning projects, but also sustains ongoing energy performance.
This guideline is based on the principles and practices of the industry standard International Performance Measurement and Verification Protocol (IPMVP) as well as ASHRAE Guideline 14-2002 “Measurement of Energy and Demand Savings.” It describes methods that can be applied under an Option C Whole Building approach, or to building systems under an Option B Retrofit Isolation approach. The required data, energy modeling techniques, and procedures to set up and complete Option B and Option C M&V analysis for energy and demand savings are described.
Subject
Subheading
Cx Guides & Papers
Measurement & Verification of Cx
(click on a Subject or a Subheading to perform search)
Add item to My List
Email a link to this item:
Print this item
©California Commissioning Collaborative. All rights reserved. Page updated February 10, 2005. |
Home
|
Contact
| ccc@peci.org | 503-595-4432